Brisbane Airport - Touchdown Areas

Retex Pavement Services were engaged to remove rubber deposits from both touchdown areas of runway 01R/19L at Brisbane Airport. A total of 7000m2 of rubber was removed in 5 hours, improving skid resistance for both touchdown areas. The works took place during a heavy maintenance shutdown of the runway.

Read more...

Gold Coast Airport - Friction Testing

Consult with Airside Asset Management and Maintenance Plan document which outlines regular friction testing regime and inspections, including electronic reporting supplied at conclusion of testing. Provide Maintenance Plan which outlines regulatory requirements for pavement friction values to ensure safe operation of aerodrome.

Read more...